메뉴열기
Heavy Industries

Creating new future values for the power systems industry

Energy Storage System (ESS)

Based on power conversion and energy operation technology, Hyosung Heavy Industries is leading the technology and market development of domestic energy storage systems. We have undertaken various activities in the ESS business ranging from supplying systems to maintenance and consulting business for construction. Based on our ample business experience and product reliability, Hyosung shows strength in the ESS business and contributes to maximizing customer value and creating new future value for the electric power industry.

Features and Benefits

Turn-key solutions
Provides a full ESS system (PCS, battery, PMS) to our customers
ESS Experts and Maintenance System
Ability to solve potential problems that may arise during projects
Work with experts to realize customer satisfaction
We increase reliability through system stabilization and quick response to system failures.
Reliability through system stabilization and quick response to system failures
ESS engineering and designing competency
Deep understanding of the grid system
Capable of designing various applications and suggesting optimal ESS specifications and operation plans through customer needs analysis

Product Type

ESS can be applied to frequency regulation, peak shaving, and renewable integration. Renewable integration is often used for microgrid in lieu of a conventional generator (diesel generator) in individual islands and deserts.

Peak Shaving

HVDC(High Voltage Direct Current transmission)
Uses

Ensure profitability by charging electricity when the cost (rate) is low and discharging it when cost is high

Shifting of maximum electricity demand time (Peak shifting)

Discharging Duration Over 2 Hours
Benefits

Consumer: reduces electricity costs

System operator: reduces risk of power shortage during peak times and reduces the investment costs to build more power plants

Key Customers End-users
Installations

In 2012, as a domestic supply business, a 250kW/500kWh ESS was installed in Guri Agro-Fishery Market

A 6MW/32MWh ESS was installed at the Busan plant of Dongkuk Steel Mill Co., Ltd.

Frequency Regulator

HVDC(High Voltage Direct Current transmission)
Uses

Grid Assistance System: Provide emergency reserve

Power Quality Improvement: Adjust frequency of generated power

Discharging Duration 15~30 Mins. (Frequency Regulation)
Benefits

Electricity company: improves efficiency of existing generators

System operator: operates the grid system operation in a more stable manner due to quicker response and improves power quality

Key Customers Power Generator
Installations

4MW ESS to provide reserve power of Jeju’s Jeochun substation and management of active/reactive power

48MW ESS for frequency regulation at Gimje substation

Renewable Integration

HVDC(High Voltage Direct Current transmission)
Uses

Electric energy supply at peak electricity demand times (REC profit obtained from weight differences)

Variation control of wind power and solar power output

Postponed investment for power system transmission capacity expansion

Discharging Duration 3~4 Hours
Benefits

Renewable power generation company: achieves additional gains by making use of REC weight differences after storage

System operator: resolves the instability of the power grid and saves the cost of operating the entire power grid by controlling waste or shortages of electricity

Key Customers Renewable Power Generation Company
Installations

Namdong Power (Youngheung Solar) 7MW / 18MWh ESS

Haenam Solar Connection 12.5MW/32MWh ESS

Pyeongchang Wind Power Connection

6MW/18MWh ESS

Micro-grid

Microgrid
Uses

Variation control of wind power and solar power output

Postponed investment for power system transmission capacity expansion

Supply power to the grid-insufficient area through renewable integration

Discharging Duration 2~5 Hours
Benefits

Efficient sales of electricity generated through monitoring of sales price after storage

Saving cost of grid operation with controlling renewables power output

Key Customers Renewable Power Generation Company
Installations

Jeju Gapado 1MW ESS

Gasado 1.25MW ESS

Mozambique Off-grid ESS

Reference

Key Delivery Performance

  • 6MW 32MWh peak reduction for Dongkuk Steel’s Busan Plant, Busan
  • 4MW 24MWh peak reduction for Daehan Steel’s Noksan Plant, Busan
  • 7.5MW 30MWh connectivity for solar power, new and renewable energy for Best Solar, Haenam-si, Jeonnam
  • 2MW 24MWh connectivity for wind power, new and renewable energy for Gangdong, Gyeongju-si, Gyeongbuk
  • 12.5MW 32MWh connectivity for solar power, new and renewable energy for Samcheonpo, Sacheon-si, Gyeongnam
  • 8MW 33MW connectivity for solar power, new and renewable energy for Haenam-si, Jeonnam
  • 1MW 2.5MWh connectivity for solar power, new and renewable energy for Byeollyang Samsuk, Suncheon-si, Jeonnam
  • 0.5MW 3MWh peak reduction and connectivity for solar power for Jeongsan International, Busan Jungsan154kV Gimje s/s
  • 48MW ESS 48MW[2MW X 24] Li-ion 12MWh (LG Chem/15min] frequency adjustment for KEPCO, Gimje, Jeonbuk
  • 7MW 18MWh connectivity for solar power, new and renewable energy for Yeongheung, Incheon
  • 6MW 18MWh connectivity for wind power, new and renewable energy for Pyeongchang, Gangwon-do
  • 4MW 16MW connectivity for wind power, new and renewable energy for Yeongheung, Incheon

Breadcrumb

//Hyosung USA TEST